Elevator: Difference between revisions
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
{{272}} | {{272}} | ||
{{blackbox}}[[File:Proposedelevator.jpg|right| | {{blackbox}}[[File:Proposedelevator.jpg|right|200px]] You are standing at the location of a future elevator construction project proposed to be built at the [[Front]] leading [[Upstairs]]. | ||
'''EXITS:''' [[Upstairs]], [[Front]] | '''EXITS:''' [[Upstairs]], [[Front]] | ||
Revision as of 08:42, 5 January 2022
| Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Stuff | Events | Projects | Meetings | Donate | E |
| 272 Capp St. | Layout | Exits | Bathrooms | Network | Audio | AV | Construction | Electrical | Storage STREET | Patio | Parking | Fence | Access | Gate | Payphone | Doorbell | Back patio | Roof | Neighbors |
E |
272 Capp St. Elevator Construction Project
Accessibility guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment.
- Details will go here as they develop.
- It fits into the larger 272 buildout plan.
Proposed Locations
- In the front to reach the top with minimal interference with core stuff at the back. -User:Culteejen
Proposed Elevator Types
Hercules II
A small lift capable of taking wheelchairs and equipment between floors.
AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift $11,000
This is what the Hercules II elevator could look like:
Error creating thumbnail: Unable to save thumbnail to destination
|
UNDER CONSTRUCTION: This part of Noisebridge is slated for construction to be upgraded or built. | Edit |
