Meeting Notes 2008 01 15: Difference between revisions

From Noisebridge
Jump to navigation Jump to search
New page: Meeting at 40 Ringold at 7 PM PST; food provided by adi. '''AGENDA''' Discussion of 24C3 How do we cover the rent? What tools and capabilities are on tap for the space?
 
No edit summary
Line 1: Line 1:
Meeting at 40 Ringold at 7 PM PST; food provided by [[adi]].
Meeting at 40 Ringold at 7 PM PST; food provided by [[adi]].


'''AGENDA'''
== AGENDA ==
   Discussion of 24C3
   Discussion of 24C3
   How do we cover the rent?
   How do we cover the rent?
   What tools and capabilities are on tap for the space?
   What tools and capabilities are on tap for the space?
== MEETING NOTES ==
We had about 15 people at the meeting.  (I don't think anybody counted                                                                                                       
or took pictures.)  The food was a success (although there was about 1.5                                                                                                     
entrees too much food).  Several people were attending their first                                                                                                           
Noisebridge meeting.                                                                                                                                                         
                                                                                                                                                                             
The discussion focused on two major areas:                                                                                                                                   
* project ideas and inspirations from other hacker spaces and events                                                                                                       
* plans and ideas about 40 Ringold                                                                                                                                         
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       
We spent about 45 minutes (in several chunks) talking over people's                                                                                                         
ideas, plans, aspirations, and inspirations.  The following ended up in                                                                                                     
my notes; unfortunately, I don't have attributions for most of them.                                                                                                         
                                                                                                                                                                             
* food hacking -- 90 micron vacuum sieve (Mark Powell?)                                                                                                                     
* ham radio (antenna mast)                                                                                                                                                 
* circuit design and building                                                                                                                                               
* blimp building                                                                                                                                                           
* photography dark room                           
* helicopters                                                                                                                                                               
                                                                                                                                                                             
One interesting phrase that was new to me is "Hacker Embassy".  I think                                                                                                      this nicely sums up one aspect of what we hope Noisebridge can be -- a                                                                                                        public face for hackers to the greater community, and also a focal point                                                                                                      for the Bay Area hacker community to interact with other hacker                                                                                                              communities around the world.
                                                                                                                                                                                                                                                                                                                     
Bill Pollock gave a status update on the building.  He has hired an                                                                                                         
architect.  They are in the planning phase; there seems to be a fair                                                                                                         
amount of flux around what work is going to be done in the near future.                                                                                                     
As I understand it, Bill's priority is to get any structural work done                                                                                                       
ASAP so that No Starch can move in without the disruption of ongoing                                                                                                         
structural work in the building.                                                                                                                                             
                                                                                                                                                                             
Structural work may include                                                                                                                                                 
* foundation work, any needed seismic improvements, water mitigation (sounds like this may be less of an issue than previously thought)                                                                                                       
* expanding the upstairs to the full building footprint (or nearly)                                                                                                         
                                                                                                                                                                             
Nonstructural construction may include                                                                                                                                       
* improving the patio / rear staircase                                                                                                                                     
* roof deck (on the part not expanded over)                                                                                                                                 
* new roof (on pitched portion, and/or on flat portion)                                                                                                                     
* skylights                                                                                                                                                                 
                                                                                                                                                                             
Interior renovation may include                                                                                                                                             
* make downstairs toilet functional                                                                                                                                         
* redo floors throughout                                                                                                                                                   
* demo some interior walls to open up space                                                                                                                                 
* redo upstairs kitchen                                                                                                                                                     
* redo upstairs bathroom                                                                                                                                                   
* new windows for improved thermal, sound                                                                                                                                   
                                                                                                                                                                             
Note that no specific work has been decided upon (well, the toilet is                                                                                                       
pretty much a lock, I suspect); practicality, price, and timeframe all 
need to be evaluated.                                                                                                                                                       
                                                                                                                                                                                                                                                                                                                                                           
Bill expressed some concern over the idea of having a significant amount                                                                                                     
of "stuff" in the upstairs space, given that there is a good chance of                                                                                                       
significant disruptive construction in the not-too-distant future.  (For                                                                                                     
example, an electronics workbench in the room where a skylight is being                                                                                                     
installed is going to get covered in construction dust; furniture such                                                                                                       
as couches or bookshelves would need to be moved in order for new                                                                                                           
flooring to be installed, and so on.)  The primary concern as I                                                                                                             
understand it is that "stuff" will impede progress on construction; it                                                                                                       
might be possible to mitigate this concern if Noisebridge members commit                                                                                                     
to moving "stuff" as necessary (between rooms, to downstairs, garage                                                                                                         
storage, etc) on short notice.                                                                                                                                               
                                                                                                                                                                             
The timeframe for this work, of course, depends on what work is being                                                                                                       
done, and there are external dependencies (on contractors, permits,                                                                                                         
materials delivery, weather, etc).  It seems safe to say that if                                                                                                             
structural work is decided upon, it won't be completed in less than                                                                                                         
three months.                                                                                                                                                               
                                                                                                                                                                                                                                                                                                                                                           
After some discussion the meeting broke up early and mostly adjourned to                                                                                                     
the EFF birthday party.

Revision as of 14:15, 16 January 2008

Meeting at 40 Ringold at 7 PM PST; food provided by adi.

AGENDA

 Discussion of 24C3
 How do we cover the rent?
 What tools and capabilities are on tap for the space?

MEETING NOTES

We had about 15 people at the meeting. (I don't think anybody counted or took pictures.) The food was a success (although there was about 1.5 entrees too much food). Several people were attending their first Noisebridge meeting.

The discussion focused on two major areas:

  • project ideas and inspirations from other hacker spaces and events
  • plans and ideas about 40 Ringold

We spent about 45 minutes (in several chunks) talking over people's ideas, plans, aspirations, and inspirations. The following ended up in my notes; unfortunately, I don't have attributions for most of them.

  • food hacking -- 90 micron vacuum sieve (Mark Powell?)
  • ham radio (antenna mast)
  • circuit design and building
  • blimp building
  • photography dark room
  • helicopters

One interesting phrase that was new to me is "Hacker Embassy". I think this nicely sums up one aspect of what we hope Noisebridge can be -- a public face for hackers to the greater community, and also a focal point for the Bay Area hacker community to interact with other hacker communities around the world.

Bill Pollock gave a status update on the building. He has hired an architect. They are in the planning phase; there seems to be a fair amount of flux around what work is going to be done in the near future. As I understand it, Bill's priority is to get any structural work done ASAP so that No Starch can move in without the disruption of ongoing structural work in the building.

Structural work may include

  • foundation work, any needed seismic improvements, water mitigation (sounds like this may be less of an issue than previously thought)
  • expanding the upstairs to the full building footprint (or nearly)

Nonstructural construction may include

  • improving the patio / rear staircase
  • roof deck (on the part not expanded over)
  • new roof (on pitched portion, and/or on flat portion)
  • skylights

Interior renovation may include

  • make downstairs toilet functional
  • redo floors throughout
  • demo some interior walls to open up space
  • redo upstairs kitchen
  • redo upstairs bathroom
  • new windows for improved thermal, sound

Note that no specific work has been decided upon (well, the toilet is pretty much a lock, I suspect); practicality, price, and timeframe all need to be evaluated.

Bill expressed some concern over the idea of having a significant amount of "stuff" in the upstairs space, given that there is a good chance of significant disruptive construction in the not-too-distant future. (For example, an electronics workbench in the room where a skylight is being installed is going to get covered in construction dust; furniture such as couches or bookshelves would need to be moved in order for new flooring to be installed, and so on.) The primary concern as I understand it is that "stuff" will impede progress on construction; it might be possible to mitigate this concern if Noisebridge members commit to moving "stuff" as necessary (between rooms, to downstairs, garage storage, etc) on short notice.

The timeframe for this work, of course, depends on what work is being done, and there are external dependencies (on contractors, permits, materials delivery, weather, etc). It seems safe to say that if structural work is decided upon, it won't be completed in less than three months.

After some discussion the meeting broke up early and mostly adjourned to the EFF birthday party.