Elevator: Difference between revisions
Jump to navigation
Jump to search
→Historic 2169 Elevator Info Below: moved to other page Tag: Replaced |
|||
| Line 7: | Line 7: | ||
* It fits into the larger [[272]] buildout plan. | * It fits into the larger [[272]] buildout plan. | ||
===Proposed Locations== | ===Proposed Locations=== | ||
*In the front to reach the top with minimal interference with core stuff at the back. -[[User:Culteejen]] | *In the front to reach the top with minimal interference with core stuff at the back. -[[User:Culteejen]] | ||
Revision as of 06:43, 5 January 2022
| Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Stuff | Events | Projects | Meetings | Donate | E |
| 272 Capp St. | Layout | Exits | Bathrooms | Network | Audio | AV | Construction | Electrical | Storage STREET | Patio | Parking | Fence | Access | Gate | Payphone | Doorbell | Back patio | Roof | Neighbors |
E |
272 Capp St. Elevator Construction Project
Accessibility guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment.
- Details will go here as they develop.
- It fits into the larger 272 buildout plan.
Proposed Locations
- In the front to reach the top with minimal interference with core stuff at the back. -User:Culteejen
|
UNDER CONSTRUCTION: This part of Noisebridge is slated for construction to be upgraded or built. | Edit |