Noisebridge Mini-Reboot 2017: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 13: | Line 13: | ||
* Add basic UPS support for Earl (Henner) | * Add basic UPS support for Earl (Henner) | ||
* New wiring for front door camera (Charlie) | * New wiring for front door camera (Charlie) | ||
* Sparkleforge door casing. Needs to be purchased, painted, and nailed in place. | |||
* Organize and Transfer Metal shop and dirty shop tools. Some tools should be in the metal shop and others in the dirty shop. These should be moved to bins in their respective shops and labeled. ( [[user:Jarrod|Jarrod]] ) | |||
* Install some metal shelves over the welding area. | |||
* Install additional 220V outlet for welder near column at west side of welding area | |||
* Conduit to door system | |||
* Fix roof leaks | * Fix roof leaks | ||
* Fix NoiseSquare | * Fix NoiseSquare | ||
Revision as of 19:59, 28 January 2017
This page will contain the To-Do-List for Mini-Reboot 2017
Mini-Reboot Projects
- Hackatorium curtains (kyle)
- NB Wiki Front Page/Calendar (lizzie)
- Dirty Shop (Nicholas Hohman/Blake)
- Electronics Area (Nemesis/J)
- Bathrooms (Chris Venter)
- Library (Trent)
- Add basic UPS support for Earl (Henner)
- New wiring for front door camera (Charlie)
- Sparkleforge door casing. Needs to be purchased, painted, and nailed in place.
- Organize and Transfer Metal shop and dirty shop tools. Some tools should be in the metal shop and others in the dirty shop. These should be moved to bins in their respective shops and labeled. ( Jarrod )
- Install some metal shelves over the welding area.
- Install additional 220V outlet for welder near column at west side of welding area
- Conduit to door system
- Fix roof leaks
- Fix NoiseSquare
- Organize Hacker Shelves
- Create Main Projects Page - A Place where you can find all the projects we have at Noisebridge.
- Look at the HDMI cable in the Hackatorium
- Replace the plug that is missing its ground pin on one of the Hackatorium tables