Elevator: Difference between revisions

From Noisebridge
Jump to navigation Jump to search
Lxpk (talk | contribs)
No edit summary
Lxpk (talk | contribs)
No edit summary
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{272}}
{{272}}
{{blackbox}}[[File:Proposedelevator.jpg|right|200px]] You are standing at the location of a future elevator construction project proposed to be built at the [[Front]] leading [[Upstairs]].
'''EXITS:''' [[Upstairs]], [[Front]]
{{cursorboxend}}


= 272 Capp St. Elevator Construction Project =
= 272 Capp St. Elevator Construction Project =
Line 10: Line 15:
*In the front to reach the top with minimal interference with core stuff at the back. -[[User:Culteejen]]
*In the front to reach the top with minimal interference with core stuff at the back. -[[User:Culteejen]]


===Proposed Elevator Types===
=Proposed Elevator Types=
* [[https://www.ameriglide.com/item/AmeriGlide-Hercules-II-Hybrid-Residential-Commercial.html AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift]] $11,000
==Hercules II==
A small lift capable of taking wheelchairs and equipment between floors.
 
[https://www.ameriglide.com/item/AmeriGlide-Hercules-II-Hybrid-Residential-Commercial.html AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift] $11,000
 
This is what the Hercules II elevator could look like:
 
[[File:Proposedelevator.jpg]]


{{construction}}
{{construction}}
{{proposal}}
{{proposal}}
 
=History=
*[[2169/Elevator]]
*[[2169/Elevator]]

Latest revision as of 08:42, 5 January 2022

Noisebridge | About | Visit | 272 | Manual | Contact | Guilds | Stuff | Events | Projects | Meetings | Donate E
272 Capp St. | Layout | Exits | Bathrooms | Network | Audio | AV | Construction | Electrical | Storage

STREET | Patio | Parking | Fence | Access | Gate | Payphone | Doorbell | Back patio | Roof | Neighbors
DOWNSTAIRS | Entrance | Stairs | Roll up door | Front | Print Shop | Arcade | Cafe |
Hackitorium | Stage | Electronics Bench | Wood Shop | Back hall | Metal Shop | Back Stairs |
UPSTAIRS | Lounge | Music | Electronics | Classrooms | Lockers | Privacy Booth | Fire escape | Plants | Sustenance | Housekeeping

E
You are standing at the location of a future elevator construction project proposed to be built at the Front leading Upstairs.

EXITS: Upstairs, Front


>

272 Capp St. Elevator Construction Project

[edit | edit source]

Accessibility guild is planning an elevator solution to reach the second floor for wheelchairs and hauling of equipment.

  • Details will go here as they develop.
  • It fits into the larger 272 buildout plan.

Proposed Locations

[edit | edit source]
  • In the front to reach the top with minimal interference with core stuff at the back. -User:Culteejen

Proposed Elevator Types

[edit | edit source]

Hercules II

[edit | edit source]

A small lift capable of taking wheelchairs and equipment between floors.

AmeriGlide Hercules II Hybrid Residential/Commercial Vertical Lift $11,000

This is what the Hercules II elevator could look like:

Error creating thumbnail: Unable to save thumbnail to destination


UNDER CONSTRUCTION: This part of Noisebridge is slated for construction to be upgraded or built. | Edit

Proposals to improve Noisebridge. Edit

History

[edit | edit source]